Edge Architecture and Edge Building & Construction provided Design-Build services to give Michigan-based Blake Farms its first hard cider production facility in New York State. Edge Architecture designed the fit-out of the production space in a 14,000 SF existing industrial building. The fit-out included tank equipment layout, coolers, trench drains, Urecrete flooring, a new septic system, lighting, and mechanical/electrical/plumbing systems. Edge Building & Construction managed all aspects of construction from demolition to tank rigging and placement to final finishes. The project from design to finish was 10 months.
Creating Blake's Hard Cider Production Facility
Previous
Previous
Expanding a school
Next
Next